DCI St. Marys Building Update: MCF Architecture Pre-bid Conference

 

Pictured L to R: John Robinson - MCF Sr. Architect; Tana Smith – JHS Director of Institutional Advancement; Bob Russ - MCF Principal, Corporate Secretary, Sr. Project Manager / Architect; Jim Prosper – DCI Executive Director, in front of DCI's new building site sign.

Exciting strides at Dickinson Center, Inc.! Today marked a pivotal moment as Dickinson teamed up with MCF Architecture to host a pre-bid conference; paving the way for the construction of DCI's new 12,000-square-foot facility in downtown St. Marys, PA. Kudos to Bob Russ and John Robinson for braving the rain during the site walk-through today (11/21/23). Big thanks go to MCF Architecture for an insightful session.